Menu
.Menu

We are apologize for the inconvenience but you need to download
more modern browser in order to be able to browse our page

Download Safari
Download Safari
Download Chrome
Download Chrome
Download Firefox
Download Firefox
Download IE 10+
Download IE 10+

Tender & Quotation Result

LAPORAN PRESTASI UNIT PEROLEHAN BAGI JAN-DIS 2014

Transaksi melalui Sistem ePerolehan bagi bulan Jan-Dis 2014.

Sebutharga bagi bulan Jan-Dis 2014.

BIL.

PERKARA

JUMLAH HARGA (RM)

TEMPOH

PENYEMPURNAAN

CATATAN

1. PERKHIDMATAN MENYEDIA, MEMASANG,
MENGENDALI DAN MEMBUKA SEMULA PERALATAN PERALATAN KESAN-KESAN KHAS FLY
SISTEM BAGI PERSEMBAHAN TEATER BIDASARI PADA 10-17 FEBRUARI 2014 DI
PANGGUNG SARI ISTANA BUDAYA.

85,776.00

10 – 17 FEB 2014

(8 HARI)

AVC AUDIO VIDEO

(30 JANUARI 2014)

2. KERJA-KERJA PEMBAIKAN & MENAIKTARAF
LAMPU BUMBUNG, LAMPU KEMASAN TANGGA & LAMPU HIASAN KOLAM ISTANA BUDAYA.

248,960.00

7 – 21 MAC 2014

(2 MINGGU)

INSPIRA RESOURCES SDN BHD

(26 FEBRUARI 2014)

3. KERJA-KERJA MENAIKTARAF TANDAS DI
BANGUNAN PANGGUNG ISTANA BUDAYA.

65,230.00

28 FEB – 14 MAC 2014

(2 MINGGU)

TANJUNG MENGKUANG ENTERPIRSE

(26 FEBRUARI 2014)

4. KERJA-KERJA MENAIKTARAF OVERSTAGE
STATE Vi(6) CONTROL SYSTEM DI PANGGUNG SARI ISTANA BUDAYA.

148,800.00

1 – 21 MAC 2014

(3 MINGGU)

ADMES ENTERPRISE

(26 FEBRUARI 2014)

5. KERJA-KERJA MENAIKTARAF TANGGA LOBI
DI BANGUNAN PANGGUNG ISTANA BUDAYA.

28,500.00

28 FEB – 14 MAC 2014 (2 MINGGU)

PEMBINAAN QHODIRI

(26 FEBRUARI 2014)

6. KERJA-KERJA PEMBAIKAN & MENAIKTARAF
SISTEM CCTV DI PANGGUNG SARI ISTANA BUDAYA.

59,940.00

10 – 14 MAC 2014

(5 HARI)

SYARIKAT USAHA SETIA

(5 MAC 2014)

7. KERJA-KERJA MENAIKTARAF BRAKE
CONTACTOR UNTUK SISTEM UNDERSTAGE & OVERSTAGE DI PANGGUNG SARI ISTANA
BUDAYA.

40,000.00

14 – 21 MAC 2014

(7 HARI)

KNI ENGINEERING

SDN BHD

(5 MAC 2014)

8. KERJA-KERJA MENAIKTARAF &
MEMBAIKPULIH 4 UNIT SISTEM WATER COOLED CHILLER (DUNHAM BUSH) SERTA
KERJA-KERJA YANG BERKAITAN DI ISTANA BUDAYA.

163,000.00

10 MAC – 14 APRIL 2014

(5 MINGGU)

LNF EXCEL ENTERPRISE

(5 MAC 2014)

9. KERJA-KERJA MENAIKTARAF &
MEMBAIKPULIH 4 UNIT MOTOR & WATER CHILLED PUMP DAN 4 UNIT MOTOR &
CONDENSOR WATER PUMP SERTA KERJA-KERJA YANG BERKAITAN DI ISTANA BUDAYA.

83,760.00

10 – 31 MAC 2014

(3 MINGGU)

INVENT INNOVATION

SDN BHD

(5 MAC 2014)

10. KERJA-KERJA MENAIKTARAF DAN
MEMBEKAL ALAT GANTI SITEM LINE ARRAY LOUDSPEAKER ELECTRO-VOICE
XLCI-127DVX DI PANGGUNG SARI ISTANA BUDAYA.

49,500.00

1 – 15 MAC 2014

(2 MINGGU)

INOVASI MULTIMEDIA SDN BHD

(28 FEBRUARI 2014)

11. PERKHIDMATAN MENYEDIAKAN DAN
MEMBEKAL KELENGKAPAN PAKAIAN KOSTUM) BAGI TUJUAN KEGUNAAN ARTIS BUDAYA,ISTANA BUDAYA

56,940.00

1 APR – 31 MEI 2014

( 2 BULAN )

DEN WAHAB INDUSTRIES SDN BHD

(28 MAC 2014)

12. PERKHIDMATAN MEMBEKALKAN KOSTUM DAN
FABRIK BAGI TEATER DI BAWAH LINDUNGAN KAABAH DI ISTANA BUDAYA

38,290.00

22 APRIL-6 MEI 2014

( 2 MINGGU)

RUMPUN SENI TRADING

(22 APRIL 2014)

13. PERKHIDMATAN MEMBINA, MEMASANG, DAN
MEMBUKA SEMULA SET BAGI TEATER DI BAWAH LINDUNGAN KAABAH DI ISTANA
BUDAYA

104,500.00

24 APRIL-20 MEI 2014

( 1 BULAN)

MYCOMZ ENTERPRISE

(23 APRIL 2014)

14. KERJA-KERJA MEMBAIKPULIH SISTEM
BEKALAN ELEKTRIK IIKV PADA HT PANEL OUTGOING TRANSFORMER B DAN
MEMBEKALKAN, MEMASANG SERTA MENTAULIAH ALATUBAH DI BILIK VOLTAN TINGGI
ISTANA BUDAYA

441,624.00

16 JUL-

15 OGOS 2014

(4 MINGGU)

NMH ENGINEERING SERVICES SDN BHD

( 16 JULAI 2014)

15. PERKHIDMATAN MEMBUAT DAN
MENYEDIAKAN PROP BAGI TEATER DI BAWAH LINDUNGAN KAABAH DI ISTANA BUDAYA

29,930.00

2-9 MEI 2014

(1 MINGGU)

WANMILL TRADING

( 2 MEI 2014)

16. PERKHIDMATAN MENYEDIAKAN KEPERLUAN
AUDIO SISTEM UNTUK TEATER DI BAWAH LINDUNGAN KAABAH DI ISTANA BUDAYA

30,000.00

5-19 MEI 2014

( 2 MINGGU)

WAVELET RESOURCES

(M) SDN BHD

17. PERKHIDMATAN MEMBEKALKAN SERTA
MENGGANTI MINYAK GEAR UNTUK GEARBOX STAGELIFT 1,2,3 DAN 4 PANGGUNG SARI,
ISTANA BUDAYA.

33,000.00

23 MEI – 6 JUN 2014

( 2 MINGGU )

HDK SERVICES

SDN BHD

( 22 MEI 2014)

18. SEBUT HARGA PERKHIDMATAN MENYEDIA,
MEMASANG, MENGENDALI, DAN MEMBUKA SEMULA PERALATAN SISTEM PROJEKTOR DAN
SISTEM PLAYBACK PADA 9 HINGGA 18 MEI 2014 BAGI TEATER DI BAWAH LINDUNGAN
KAABAH DI ISTANA BUDAYA.

77,000.00

8 -18 MEI 2014

(2 MINGGU)

AVC AUDIO VIDEO

(7 MEI 2014)

19. SEBUT HARGA MENYEWA DAN MENJALANKAN
PERKHIDMATAN KAFETARIA DI D’ISTANA JALAMAS ISTANA BUDAYA, JALAN TUN
RAZAK, 50694 KUALA LUMPUR

192,000.00

1 SEPT. 2014-

31 OGOS 2016

( 2 TAHUN )

AROMARISSA SDN BHD

(11 OGOS 2014)

20. PERKHIDMATAN MEMBINA, MEMASANG, DAN
MEMBUKA SEMULA SET UNTUK PERSEMBAHAN “MAGIC OF THE NIGHT” PADA 14-22 JUN
2014 DI MARINA PUTRAJAYA

99,300.00

3-22 JUN 2014

( 2 MINGGU)

JELAPANG GEMILANG

ENTERPRISE

(2 JUN 2014)

21. PERKHIDMATAN MEMBEKAL DAN
MENYELENGGARA PERALATAN TANDAS DI BANGUNAN PANGGUNG DAN PENTADBIRAN
ISTANA BUDAYA

91,579.92

1 SEPT. 2014-

31 OGOS 2016

( 2 TAHUN )

TMR ECO SDN BHD

( 27 OGOS 2014)

22. PERKHIDMATAN MEMBINA, MEMASANG, DAN
MEMBUKA SEMULA SET UNTUK PEMENTASAN TEATER BAHAYANYA WANITA DI THE STAR,
SINGAPURA PADA 16 OGOS 2014

130,000.00

18 JUL-

17 OGOS 2014

( 1 BULAN)

KAMSOL CORPORATION SB

(16 JULAI 2014)

23. PERKHIDMATAN MENYEDIAKAN
PERSEMBAHAN MAJLIS RUMAH TERBUKA HARI RAYA AIDILFITRI BERSAMA YAB
PERDANA MENTERI DAN AHLI JEMAAH MENTERI DI SRI PERDANA PUTRAJAYAPADA 28 JULAI 2014

 

DIBATALKAN

24. PERKHIDMATAN MEMBEKAL TONER-TONER
PENCETAK BAGI ISTANA BUDAYA, JALAN TUN RAZAK

(MASIH DI PERINGKAT PENILAIAN)

25. PERKHIDMATAN MEMBEKAL ‘HOT AND COLD
DISPENCER’ DAN AIR MINUMAN REVERSE OSMOSIS DI ISTANA BUDAYA

28,800.00

1 SEPT. 2014-

31 OGOS 2016

( 2 TAHUN )

REGALWATER

SDN BHD

( 22 OGOS 2014)

26. PERKHIDMATAN MENYEDIAKAN SEWAAN
PERALATAN DAN KELENGKAPAN KOMPUTER DI ISTANA BUDAYA

193,260.00

1 OKTOBER 2014-

30 SEPT.2015

( 1 TAHUN )

MUTIARA.COM SB

( 29 SEPT. 2014 )

27. PERKHIDMATAN MEREKABENTUK,
MENAIKTARAF, MIGRASI DATA, MENGHANTAR, MENGUJI, MEMASANG, MENDOKUMENTASI,
MENTAULIAH DAH MENYELENGGARA LAMAN WEB RASMI ISTANA BUDAYA

68,900.00

7 OKT 2014-

6 JAN 2015

( 3 BULAN )

TELCOWIN SDN BHD

( 1 OKTOBER 2014 )

28. KERJA-KERJA PENYELENGGARAAN
REFLECTIVE POOL DI ISTANA BUDAYA

54,000.00

15 OKT 2014-

14 OKT 2015

( 12 BULAN )

DINO ENTERPRISE

( 1 OKTOBER 2014 )

29. PERKHIDMATAN MENAIKTARAF 3 UNIT
MOTOR CHILLED WATER PUMP (CHWP) SERTA KERJA-KERJA YANG BERKAITAN BAGI
SISTEM PENGHAWA DINGIN DI BANGUNAN PENTADBIRAN ISTANA BUDAYA

(MASIH DI PERINGKAT PENILAIAN)

30. KERJA-KERJA PENYELENGGARAAN SISTEM
ELEKTRIK/ POWER ELEKTRONIK UNTUK STAGE MACHINERY AND RIGGING EQUIPMENT
DI ISTANA BUDAYA

(MASIH DI PERINGKAT PENILAIAN)

31. PENYELENGGARAAN PERALATAN MEKANIKAL
‘THE STAGE MACHINERY AND RIGGING EQUIPMENT’ DI ISTANA BUDAYA BAGI TAHUN
2015

(MASIH DI PERINGKAT PENILAIAN)

32. PERKHIDMATAN MEMBINA, MEMASANG, DAN
MEMBUKA SEMULA SET UNTUK PERSEMBAHAN MAJLIS RUMAH TERBUKA MALAYSIA
DEEPAVALI DI A’FAMOSA MELAKA PADA 1 NOVEMBER 2014

(MASIH DI PERINGKAT PENILAIAN)

Acitvity

There is no activity for now.

W3C